Struktur baja isolasi untuk gudang
Rumah bengkel logam yang dapat disesuaikan
,Pondok-pondok bengkel logam prafabrikasi
,Struktur baja isolasi untuk gudang
| Kategori | Spesifikasi Kinerja |
|---|---|
| Kinerja Struktural |
|
| Efisiensi Konstruksi |
|
| Keberlanjutan |
|
| Integrasi Cerdas |
|
- Bahan: Baja H Bagian Dilas/Hot Rolled Q345B (S355JR) atau Q235B(S235JR)
- Permukaan: Galvanis Celup Panas atau Dicat
- Koneksi: Semua Koneksi Baut
| Komponen | Spesifikasi |
|---|---|
| Purlin Atap | Baja Bagian C atau Z, Q235B |
| Purlin Dinding | Baja Bagian C atau Z, Q235B |
| Bracing | Batang Baja, Q235B |
| Penopang Silang | Batang Baja, Q235B |
| Penopang Kolom | Baja Sudut; Batang Baja; Q235B |
- Lembaran Baja Bergelombang Berwarna Tunggal (Ketebalan: 0,3-0,8mm)
- Panel Sandwich dengan EPS, Rock Wool, Fiberglass, PU (Ketebalan: 50-150mm)
| Komponen | Opsi |
|---|---|
| Pintu | Geser; Pintu Gulung (Manual/Otomatis) |
| Jendela | Paduan Aluminium; PVC |
| Ventilator | Ventilator Turbin Stainless Steel |
| Sabuk Skylight | Sabuk Skylight Semi-transparan FRP atau PC |
- Kekuatan Tinggi: Kekuatan tarik dan tekan superior untuk beban berat
- Ringan: 30% lebih ringan dari bangunan baja konvensional
- Daktilitas: Mudah dibentuk untuk persyaratan arsitektur yang kompleks
- Ketahanan Korosi: Permukaan galvanis atau dicat untuk daya tahan
- Ketahanan Api: Lapisan tahan api opsional tersedia
- Konsultasi awal untuk memahami kebutuhan Anda
- Analisis rekayasa spesifik lokasi
- Pemodelan 3D dan perhitungan struktural
- Pemilihan dan optimasi material
- Persetujuan akhir dan manufaktur
- Rapat Audit Kualitas Mingguan
- Sesi pelatihan karyawan dua mingguan
- Sistem Kontrol Kualitas ISO 9001
- Pengumpulan umpan balik klien bulanan
- Inspeksi kualitas 100% di semua tahap produksi
-
RAs a cold chain logistics company, we have very strict requirements for the insulation and sealing of our warehouses. The team at Yidongxiang worked closely with our insulation supplier to solve the connection problem between the steel structure and the insulation layer perfectly. Now the insulation effect of the warehouse is even better than expected, and the operating costs have been reduced by 15%.
-
JYidongxiang's construction speed is truly remarkable. Our 10,000-square-meter warehouse was completed and delivered within just 45 days after the contract was signed. Moreover, their overall service is very professional. From design to installation, there are dedicated personnel handling each step. We hardly had to worry about any details.
-
DWe need warehouses with snow-resistant structures in our logistics park in Toronto. The design team of Yidongxiang optimized the roof load according to the local climate and adopted thickened H-shaped steel and a snow accumulation drainage system. Last year, during the rare heavy snowfall, the warehouse suffered no damage at all and the quality exceeded expectations completely.
Indonesian