Pre Engineered Steel Frame Building Construction Sustainable Eco Friendly
Pre Engineered Steel Frame Building Construction
,Steel Frame Building Construction Sustainable
- Product Name: Steel Frame Building Construction
- Design Options: Versatile
- Construction Time: Short
- Longevity: Long-lasting
- Durability: High
- Material: Steel
- Fire Resistance: High
- Weather Resistance: High
- Customization: Possible
| Component | Specification |
|---|---|
| Main Steel Frame | Steel Column & Beam: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel |
| Supporting System | Roof Purlin: C or Z Section Steel, Q235B Wall Purlin: C or Z Section Steel, Q235B Bracing: Steel Rod, Q235B Cross Support: Steel Rod, Q235B Column Support: Angle Steel; Steel Rod; Q235B |
| Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm 2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm |
| Accessories | Door: Sliding; Rolled Up Door (Manual/Auto) Window: Aluminum Alloy; PVC Downspout: PVC pipe Gutter: Galvanized Steel Sheet; Stainless Steel Ventilator: Stainless Steel Turbine Ventilator Skylight Belt: FRP or PC semi-transparent Skylight Belt |
| Brand Name | YDX |
| Model Number | YDX-J8 |
| Place Of Origin | China, Qingdao |
| Certification | CE, ISO, SGS |
| Minimum Order Quantity | 1-10000 Square Meters |
| Price | $36.00-$66.00 |
| Delivery Time | 30 Working Days |
| Payment Terms | T/T |
| Supply Ability | 10000 Tons/month |
- Assistance with design and engineering of steel frame structures
- Guidance on installation and construction processes
- Troubleshooting and problem-solving support
- Maintenance and repair services for steel frame buildings
| Item | Details |
|---|---|
| Location (where will be built?) | _____country, area |
| Size: length*width*height | _____mm*_____mm*_____mm |
| wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| snow load (max. snow height) | _____kn/m2, _____mm |
| anti-earthquake | _____level |
| brickwall needed or not | If yes, 1.2m high or 1.5m high |
| thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| door quantity & size | _____units, _____(width)mm*_____(height)mm |
| window quanity & size | _____units, _____(width)mm*_____(height)mm |
| crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |