High Strength Fast Delivery Prefabricated Steel Structure Lightweight Construction for Warehouse
High Strength Prefabricated Steel Structure
,Fast Delivery Steel Frame Building
,Lightweight Construction Steel Warehouse
| Attribute | Value |
|---|---|
| Application Fields | Warehouse, Multi-building, Workshops & plants, Hospital, School, Office, Apartment |
| Drawing Design | AUTOCAD, SOLIDWORKS, TEKLA |
| Maximum Roof Load (lb./sq.ft) | 20+lb/sq.ft |
| Raw Steel Material | Q235B, Q355B, ASTM A36 |
| Frame Type | Portal Frame |
| Design Parameter | Wind Load, Snow Load And Earthquake |
| Working Scope | Design, Fabrication, Installation |
| Life Span | Around 30~50 Year |
| Surface treatment | 1. Painting; 2. Galvanized |
| Standard | GB, ASTM, EN, ISO, AS/ANS |
- Lightweight construction with high strength, large spans, and reduced foundation pressure
- Shorter construction period compared to concrete buildings with simple on-site assembly
- 20-30% lower investment cost than traditional buildings
- High fireproof performance and corrosion resistance
- Buildings can be disassembled, moved easily, and recycled with no pollution
| Component | Specification |
|---|---|
| Dimension | Length * width * eave height, roof slope |
| Type | Single/double/multi-slope; Single/double/multi-span; Single/double/multi-floor |
| Foundation | Concrete and steel foundation bolts |
| Column and Beam | Hot rolled or welded H steel Q355B, high strength bolts connection, straight or variable cross-section |
| Bracing | X or V type bracing made from angle steel or pipe |
| C/Z Purlin | Q235B C/Z section steel (C160-300 or Z160-300) |
| Roof/Wall Panel | Single colorful corrugated steel sheet or sandwich panel with EPS, rock wool, glass wool, or PU insulation |
| Accessories | Skylight belts, ventilators, down pipes, gutters, doors, windows |
| Surface Treatment | Painting or hot dip galvanized |
| Package | Nude or packed on steel pallet in 40'HQ/OT containers |
Method 2: If you still don't know how to install, we will teach you the installation in our factory. When necessary, we will assemble a sample steel structure building for you.
- Professional design team - we design drawings to your requirements or calculate steel quantity based on your drawings
- Skilled fabrication team and advanced equipment with independent production schedules for each project
- One-stop service - we provide integrated proposals for your project based on extensive experience
- Professional QC team guarantees production and service meet your requirements
- Comprehensive after-sales service including maintenance support for insulation and steel components
Pre-production samples and final inspections before shipment ensure consistent quality standards.
Steel Structure Warehouses, Workshops, Buildings, Poultry Houses, and Prefab Houses.
20+ years experience providing complete steel structure solutions with integrated design, fabrication, and installation services.
| Item | Details Required |
|---|---|
| 1. Location (where will be built?) | _____country, area |
| 2. Size: length*width*height | _____mm*_____mm*_____mm |
| 3. Wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4. Snow load (max. snow height) | _____kn/m2, _____mm |
| 5. Anti-earthquake | _____level |
| 6. Brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7. Thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, metal steel sheets will be used at lower cost |
| 8. Door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9. Window quantity & size | _____units, _____(width)mm*_____(height)mm |
| 10. Crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
RAs a cold chain logistics company, we have very strict requirements for the insulation and sealing of our warehouses. The team at Yidongxiang worked closely with our insulation supplier to solve the connection problem between the steel structure and the insulation layer perfectly. Now the insulation effect of the warehouse is even better than expected, and the operating costs have been reduced by 15%.