Secondary Frame Prefab Steel Structure Storage Warehouse With Hot Dipped Galvanized Purlin
Prefab Steel Structure Storage Warehouse
,Secondary Steel Structure Storage Warehouse
- Product Name: Steel Structure Warehouse
- Product Type: Warehouse
- Primary Use: Industrial and commercial storage
- Raw Steel Material: Q235B, Q355B
- Certifications: SGS, CE, ISO
- Main Steel Frame: H Steel, Z or C Purlin
- Secondary Frame: Hot Dipped Galvanized Purlin
| Component | Specification |
|---|---|
| Main Steel Frame | H Steel, Z Or C Purlin |
| Secondary Frame | Hot Dipped Galvanized Purlin |
| Raw Steel Material | Q235B, Q355B |
| Certifications | SGS/CE/ISO |
| Service Life | 50-70 years |
| Component | Description |
|---|---|
| Primary Framing | Box beam column, cross steel column, H-shaped steel column, steel beam |
| Secondary Framing | Galvanized Z and C sections purlin |
| Roof and Wall panels | Steel sheet and insulated sandwich panels (EPS, fiberglass wool and PU) |
| Steel Decking Floor | Galvanized steel decking board |
| Structural subsystem | Divider, gutter, awning, partition wall |
| Parameter | Details Required |
|---|---|
| Location | Country and area where structure will be built |
| Dimensions | Length × Width × Height (in mm) |
| Environmental Factors | Wind load, snow load, and earthquake resistance requirements |
| Insulation | Type of thermal insulation required (EPS, fiberglass, rockwool, PU) |
| Openings | Number and size of doors and windows |
| Brand Name | YDX |
| Model Number | YDX-O6 |
| Place of Origin | Qingdao, China |
| Minimum Order | 1-10,000 square meters |
| Price Range | $35.00 - $63.00 per square meter |
| Delivery Time | 20-30 working days |
| Payment Terms | T/T |
| Monthly Capacity | 10,000 tons |
-
AWhen building warehouses in tropical regions, ventilation and insulation are crucial. The design team of Yidongxiang optimized the natural ventilation system of the warehouse and also adopted insulation roofing materials. Now, the temperature inside the warehouse is about 8℃ lower than outside, significantly reducing our air conditioning costs.
-
ZFrom signing the contract to the warehouse delivery, it only took 45 days. Yidongxiang's construction speed is truly very fast. Moreover, there are always dedicated personnel following up on the progress throughout the process. We can always keep track of the construction situation. Now, we no longer have to worry about the stock preparation for our big promotion.
-
CThe service provided by Yidongxiang is truly professional. Their technical team actively inquired about our production process and specifically optimized the lighting layout of the workshop. As a result, the working environment for the workers has improved significantly, and the production efficiency has also shown a notable increase.