Modern Prefab Steel Warehouse Building Designs Advanced Insulation Energy Efficiency
Advanced Steel Warehouse Building Designs
,Modern prefabricated structures
,Advanced prefabricated structures
- Light Frame Steel Construction Hangar Design
- Prefabricated Steel Structure Factory Building
- Workshop warehouse solutions
| Component | Specification |
|---|---|
| Main Steel Frame Steel Column & Beam |
1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel 2. Surface: Hot Dip Galvanized or Painted 3. Connection: All Bolts Connection |
| Supporting System | Roof Purlin: C or Z Section Steel, Q235B Wall Purlin: C or Z Section Steel, Q235B Bracing: Steel Rod, Q235B Cross Support: Steel Rod, Q235B Column Support: Angle Steel; Steel Rod; Q235B Angle Brace: Angle steel, Q235B Tie Bar: Steel Pipe, Q235B |
| Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm 2. Sandwich Panel with EPS, Rock Wool, Fiberglass, PU; Thickness: 50-150mm |
| Accessories | Door: Sliding; Rolled Up Door (Manual/Auto) Window: Aluminum Alloy; PVC Downspout: PVC pipe Gutter: Galvanized Steel Sheet; Stainless Steel Ventilator: Stainless Steel Turbine Ventilator Skylight Belt: FRP or PC semi-transparent Skylight Belt Flash: Color Steel Sheet Fittings: Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc |
As a leading steel structure manufacturer, we provide custom design, precision fabrication, and on-site technical guidance for international projects. Our buildings are engineered for industrial plants, warehouses, and commercial spaces, ensuring high load capacity, corrosion resistance, and fast construction. We offer detailed CAD drawings, material certifications, and overseas installation supervision to guarantee quality compliance.
Specializing in pre-engineered steel buildings, we deliver turnkey solutions from design to installation support. Our team assists with foundation plans, structural calculations, and step-by-step overseas construction guidance. Ideal for workshops, agricultural storage, and multi-story buildings, with GB-standard materials and anti-rust treatments.
From conceptual design to production and global logistics, we provide end-to-end steel structure solutions. Our engineers support clients with erection manuals, 3D modeling, and dispatch technicians for foreign projects. Suitable for airports, stadiums, and factories, featuring bolted connections for easy assembly and seismic-resistant designs.
| 1. Location (where will be built?) | _____country, area |
| 2. Size: length*width*height | _____mm*_____mm*_____mm |
| 3. Wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4. Snow load (max. snow height) | _____kn/m2, _____mm |
| 5. Anti-earthquake | _____level |
| 6. Brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7. Thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8. Door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9. Window quantity & size | _____units, _____(width)mm*_____(height)mm |
| 10. Crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
RWe are a textile factory and require large-span production workshops and warehouses. Yidongxiang's column-less design provides us with the maximum space for equipment layout. Their H-shaped steel has a thickness 2mm higher than the industry standard, and the anti-corrosion coating has also been thickened. So far, after half a year of operation, there have been no problems at all.
-
COur steel structure building requires exterior facade beautification. The team from Yidongxiang provided us with various exterior facade design options for selection. The final result is very beautiful, enhancing our company's image. Now, when customers come to visit, they are all full of praise.
-
RAs a cold chain logistics company, we have very strict requirements for the insulation and sealing of our warehouses. The team at Yidongxiang worked closely with our insulation supplier to solve the connection problem between the steel structure and the insulation layer perfectly. Now the insulation effect of the warehouse is even better than expected, and the operating costs have been reduced by 15%.
English