Galvanized Steel Frame Warehouse 30m x 50m Fireproof Construction
Galvanized Prefab Warehouse Building
,Economical Prefab Warehouse Building
,Welded Prefab Warehouse Building
| Attribute | Value |
|---|---|
| Fireproof | Fire-resistant |
| Window | Aluminum Sliding Window |
| Column | Square Tube |
| Highlight | Painted Steel Structure Warehouse |
| Installation Method | Bolted or Welded |
| Roof Cladding | Color Steel Sheet (Sandwich Panel) |
| Product Insulation | Thermal Insulation |
| Roof Purlin | Z/C section Purlin |
| Structure Type | Frame |
| Frame Type | Steel Frame |
| Earthquake Resistance | Strong |
| Seismic Design | High Seismic Zone |
| Installation Time | Short |
| Aesthetics | Modern |
| Cost | Moderate |
| Product Resistance | Corrosion Resistant |
| Finish | Galvanized/Painted/Cladding |
| Roof | Glass Wool, EPS, PU |
| Product Fire Resistance | Fireproof |
| Door | Sliding Door or Rolling Door |
- Maximize Space: Steel buildings can be constructed without interior columns, providing unobstructed floor space for operations and storage.
- Expansion-Friendly: Easily extendable in future years if properly erected and maintained, eliminating the need for new construction.
- Durable: Superior strength withstands impact damage from heavy objects or machinery common in industrial settings.
- Energy Efficient: Reflective metal surfaces help regulate temperature, reducing heating and cooling costs. Optional insulation available for optimal thermal control.
- Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel
- Surface: Hot Dip Galvanized or Painted
- Connection: All Bolts Connection
- Roof Purlin: C or Z Section Steel, Q235B
- Wall Purlin: C or Z Section Steel, Q235B
- Bracing: Steel Rod, Q235B
- Cross Support: Steel Rod, Q235B
- Column Support: Angle Steel; Steel Rod; Q235B
- Angle Brace: Angle steel, Q235B
- Tie Bar: Steel Pipe, Q235B
1. Single Colorful Corrugated Steel Sheet (Thickness: 0.3-0.8mm)
2. Sandwich Panel with EPS, Rock Wool, Fiberglass, PU (Thickness: 50-150mm)
- Door: Sliding; Rolled Up Door (Manual/Auto)
- Window: Aluminum Alloy; PVC
- Downspout: PVC pipe
- Gutter: Galvanized Steel Sheet; Stainless Steel
- Ventilator: Stainless Steel Turbine Ventilator
- Skylight Belt: FRP or PC semi-transparent Skylight Belt
- Flash: Color Steel Sheet
- Fittings: Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc
| Question | Information Needed |
|---|---|
| 1. Location (where will be built?) | _____country, area |
| 2. Size: length*width*height | _____mm*_____mm*_____mm |
| 3. Wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4. Snow load (max. snow height) | _____kn/m2, _____mm |
| 5. Anti-earthquake | _____level |
| 6. Brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7. Thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, metal steel sheets will be used (lower cost) |
| 8. Door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9. Window quantity & size | _____units, _____(width)mm*_____(height)mm |
| 10. Crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
MWhen building a warehouse in an earthquake-prone area, safety is of the utmost importance to us. The steel structure warehouse of Yidongxiang has been designed with an earthquake resistance level of 9. All the joints have been reinforced. During an earthquake, the warehouse remained intact and the goods we stored were not damaged. We are truly at ease.
-
RAs a cold chain logistics company, we have very strict requirements for the insulation and sealing of our warehouses. The team at Yidongxiang worked closely with our insulation supplier to solve the connection problem between the steel structure and the insulation layer perfectly. Now the insulation effect of the warehouse is even better than expected, and the operating costs have been reduced by 15%.
-
JYidongxiang's construction speed is truly remarkable. Our 10,000-square-meter warehouse was completed and delivered within just 45 days after the contract was signed. Moreover, their overall service is very professional. From design to installation, there are dedicated personnel handling each step. We hardly had to worry about any details.