Pre Engineered Steel Frame Workshop Building with Overhead Crane
pre engineered steel workshop building
,steel frame building with crane
,overhead crane workshop construction
Pre Engineered Metal Workshop Building With Overhead Crane / Prefab Metal Workshop
Pre Engineered Metal Workshop Building With Overhead Crane / Prefab Metal Workshop. This is a Pre engineered Metal Workshop Building Builders With Overhead Crane for . It is used as a mechanical maintenance workshop for . It has one 20T electric single girder crane and two 5T electric single girder cranes inside. Roof and wall panel is Rock wool composite panel. We designed the drawing, fabricated all the steel structure components in our factory, installed the steel structure and crane , wall and roof panel for .
As has very strict quality requirement for the welded steel structure, they ask for SGS to carry out the Third-party Inspection. We coordinate SGS for Inspection for the welding and painting quality of steel structure in our factory and successfully passed the inspection.
Steel frame structure bulidings has Light weight, high strength, large span, simple construction, short construction period: all components are prefabricated in the factory, the site is simply assembled, thus greatly shortening the construction period, a 6000 square meters of buildings, only 40 days to complete the basic installation.Beautiful and practical: the steel structure building line is simple and smooth, has the modern feeling.Color wall panels are available in a variety of colors, and other materials can be used for the wall, so it is more flexible.Reasonable cost: the steel structure building is light in weight, which reduces the basic cost, and the construction speed is fast, which can be completed and put into production as soon as possible. The comprehensive economic benefit is much better than the concrete structure building.
| Product Application | |||
| Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse | |||
| A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding! | |||
| An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework. | |||
| SPECIFICATION FOR STEEL STRUCTURE BUILDING | |||
| Main Steel Frame | Steel Column & Beam | 1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel | |
| 2. Surface: Hot Dip Galvanized or Painted; | |||
| 3. Connection: All Bolts Connection; | |||
| Supporting System | Roof Purlin | C or Z Section Steel, Q235B | |
| Wall Purlin | C or Z Section Steel, Q235B | ||
| Bracing | Steel Rod, Q235B | ||
| Cross Support | Steel Rod, Q235B | ||
| Column Support | Angle Steel; Steel Rod; Q235B | ||
| Angle Brace | Angle steel,Q235B | ||
| Tie Bar | Steel Pipe,Q235B | ||
| Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm |
||
| 2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm; |
|||
| Accessories | Door | Sliding; Rolled Up Door (Manual/Auto) | |
| Window | Aluminum Alloy; PVC; | ||
| Downspout | PVC pipe; | ||
| Gutter | Galvanized Steel Sheet; Stainless Steel | ||
| Ventilator | Stainless Steel Turbine Ventilator | ||
| Skylight Belt | FRP or PC semi-transparent Skylight Belt | ||
| Flash | Color Steel Sheet | ||
| Fittings | Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc | ||

Modern industrial requirements for steel structures include:
- Strength and durability: High-performance structures capable of withstanding environmental conditions and natural disasters while ensuring long-term safety.
- Aesthetics and flexibility: Modern designs with customizable features to meet diverse project requirements.
- Sustainability: Environmentally friendly solutions with energy efficiency and reduced carbon emissions.
- Cost-effectiveness: Economical solutions with rapid construction timelines to meet market demands.
- Structural steel fabrication, painting, galvanizing, and pre-assembly
- Design, fabrication and installation of prefabricated steel structures
- Detailed fabrication drawings based on architectural plans
- Technical advice for usage, maintenance and improvements
- Raw material quality control: Thickness tolerance <0.25mm, yield and tension strength testing, third party inspection
- Fabrication quality control: 100% dimension testing, 20% ultrasonic and magnetic powder testing
- Surface treatment: SA 2.5 shot blasting, holiday-free coatings with DFT >75UM
- Pre-assembly testing of all connection details
Packing and Transport
All components are packed in standard export packages suitable for ocean transportation and loaded into 40'HQ containers. Our skilled workers use cranes and forklifts to prevent damage during loading.
FAQ
1. What are the main differences between a steel structure office building and a steel workshop?
Steel office buildings focus on office comfort, sound insulation, daylighting, facade aesthetics and public building fire compliance. It adopts light long-span steel frame with higher requirements for interior finishing, noise control and thermal insulation. Steel workshops are designed for heavy equipment load, crane load and mechanical vibration resistance, with heavier main steel frames and priority given to industrial operation.
2. Can the facade adopt glass curtain wall?
Sure. Glass curtain wall, aluminum veneer, stone-like coating and integrated thermal insulation wall panels are all optional facade solutions. We can customize the exterior style according to your aesthetic requirements.
3. What are the main steel materials used?
Main frame: Q355B H-section steel. Secondary components: Q235B steel. Surface treatment: sand blasting + multi-layer anti-corrosion and fire-proof paint or hot-dip galvanizing as options.
4. How many floors can the steel structure office building be built?
Conventional design: 2–6 floors. Higher floors can be customized after professional structural calculation according to local wind load, seismic standard and land conditions.
| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4 | snow load (max. snow height) | _____kn/m2, _____mm |
| 5 | anti-earthquake | _____level |
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
FWe are a grain processing company and we need large storage warehouses for storing a large quantity of grains. Yidongxiang's steel structure warehouse has a net height of 10 meters. The shelves can be built up to 8 meters high, and the storage capacity has increased by 50% compared to the previous warehouse. Moreover, their pest and rodent prevention design is also very thorough, resulting in a significant reduction in grain loss.
-
JYidongxiang's construction speed is truly remarkable. Our 10,000-square-meter warehouse was completed and delivered within just 45 days after the contract was signed. Moreover, their overall service is very professional. From design to installation, there are dedicated personnel handling each step. We hardly had to worry about any details.
-
DWe need warehouses with snow-resistant structures in our logistics park in Toronto. The design team of Yidongxiang optimized the roof load according to the local climate and adopted thickened H-shaped steel and a snow accumulation drainage system. Last year, during the rare heavy snowfall, the warehouse suffered no damage at all and the quality exceeded expectations completely.