Custom Steel Frame Building For Activity Centers Fast Construction
Fast Construction Steel Frame Building
,Activity Centers Steel Frame Building
,Custom Steel Frame Structure
| Attribute | Value |
|---|---|
| Drawing | CAD, TEKLA, 3D Model, PKPM, BIM |
| Connect | Bolt/Weld |
| Speed Of Construction | Fast |
| Corrosion Resistance | High |
| Cladding | PU/Rock Wool/Fiberglass/EP |
| Windows | Aluminum |
| Product Flexibility | Flexible |
| Apply | Easy to Apply |
| Design | Custom For Free |
| Frame Type | Steel Frame |
| Installation Time | Faster construction time |
| Installation | Engineer Guidance On Site |
| Shape | As The Customer Request |
| Door | Aluminum Or Steel Wood Door |
Welded H section steel beams and columns are connected by high strength bolts to form the main steel frame structure. The clean span design without center columns provides large open spaces. Double row windows provide ample natural lighting. Environmental epoxy floor coating offers superior dustproof properties and creates a smooth surface. The structure includes a two-story office building within the main facility.
- Primary Framing: Box beam column, cross steel column, H-shaped steel column, steel beam
- Secondary Framing: Galvanized Z and C sections purlin
- Roof and Wall panels: Steel sheet and insulated sandwich panels (EPS, fiberglass wool and PU)
- Steel Decking Floor: Galvanized steel decking board
- Structural subsystem: Divider, gutter, awning, partition wall
- Mezzanines, Platforms: Painted or galvanized H beam
- Other Building Accessories: Sliding doors, roll up doors, aluminium windows, louvers
| Connection | Intensive bolt, ordinary bolt |
| Window | PVC steel or aluminum alloy |
| Downspout | PVC pipe or as per customer's request |
| Door | Sliding or rolling door |
| Purlin | C/Z shape profile |
| Panel | EPS/PU/fiber glass/rock wool |
| Main Frame | Welded or hot rolled H-shaped steel, columns, beams, box beams and columns |
- Customized designs available
- For accurate quotations and drawings, please provide length, width, eave height and local weather conditions
Ideal for light frame steel construction, hangar design, prefabricated steel structure factory buildings, workshops, and warehouses.
- High strength and light weight: Offers superior strength-to-weight ratio for large span structures
- Good plasticity and toughness: Withstands accidental overloads and dynamic loads effectively
- Industrialized production: Precision manufacturing in specialized facilities
- Fast construction: Prefabricated components enable rapid on-site assembly
- Wind resistance: Excellent structural stability and deformation capability
- Cost effective: Reduced foundation requirements and faster completion times
- Environmentally friendly: Steel is fully recyclable with minimal construction waste
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
- Structural steel fabrication, painting, galvanizing, and pre-assembly
- Design, fabrication and installation of prefabricated steel structures
- Detailed fabrication drawings based on architectural plans
- Technical advice for usage, maintenance and improvements
FAQ
1. What are the main differences between a steel structure office building and a steel workshop?
Steel office buildings focus on office comfort, sound insulation, daylighting, facade aesthetics and public building fire compliance. It adopts light long-span steel frame with higher requirements for interior finishing, noise control and thermal insulation. Steel workshops are designed for heavy equipment load, crane load and mechanical vibration resistance, with heavier main steel frames and priority given to industrial operation.
2. Can the facade adopt glass curtain wall?
Sure. Glass curtain wall, aluminum veneer, stone-like coating and integrated thermal insulation wall panels are all optional facade solutions. We can customize the exterior style according to your aesthetic requirements.
3. What are the main steel materials used?
Main frame: Q355B H-section steel. Secondary components: Q235B steel. Surface treatment: sand blasting + multi-layer anti-corrosion and fire-proof paint or hot-dip galvanizing as options.
4. How many floors can the steel structure office building be built?
Conventional design: 2–6 floors. Higher floors can be customized after professional structural calculation according to local wind load, seismic standard and land conditions.
| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4 | snow load (max. snow height) | _____kn/m2, _____mm |
| 5 | anti-earthquake | _____level |
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
RWe are a textile factory and require large-span production workshops and warehouses. Yidongxiang's column-less design provides us with the maximum space for equipment layout. Their H-shaped steel has a thickness 2mm higher than the industry standard, and the anti-corrosion coating has also been thickened. So far, after half a year of operation, there have been no problems at all.
-
RAs a cold chain logistics company, we have very strict requirements for the insulation and sealing of our warehouses. The team at Yidongxiang worked closely with our insulation supplier to solve the connection problem between the steel structure and the insulation layer perfectly. Now the insulation effect of the warehouse is even better than expected, and the operating costs have been reduced by 15%.
-
JYidongxiang's construction speed is truly remarkable. Our 10,000-square-meter warehouse was completed and delivered within just 45 days after the contract was signed. Moreover, their overall service is very professional. From design to installation, there are dedicated personnel handling each step. We hardly had to worry about any details.
English