Prefab Steel Structure Warehouse Workshop Large Span
prefab steel warehouse building
,large span steel workshop
,steel frame construction warehouse
| Attribute | Value |
|---|---|
| Main Structure | Welded/Hot Rolled H Section Steel |
| Frame | Steel Structure |
| Visit | Acceptable |
| Install | Support Installation |
| Structure Type | Prefabricated |
| Construction Type | Frame |
| Customization | Possible |
| Apply | Easy to Apply |
| Product Material | Steel |
| Application | Warehouse, Factory, Workshop, Plant |
| Product Usage | Building Construction |
Our prefabricated steel structure warehouse buildings feature a multi-level design with wide spans for workshop applications. The main load-bearing components are constructed from high-quality steel, including columns, beams, foundations, and roof trusses.
- Roof Purlin: C or Z Section Steel, Q235B
- Wall Purlin: C or Z Section Steel, Q235B
- Bracing: Steel Rod, Q235B
- Cross Support: Steel Rod, Q235B
- Column Support: Angle Steel; Steel Rod; Q235B
- Angle Brace: Angle steel, Q235B
- Tie Bar: Steel Pipe, Q235B
- Single Colorful Corrugated Steel Sheet (Thickness: 0.3-0.8mm)
- Sandwich Panel with EPS, Rock Wool, Fiberglass, PU (Thickness: 50-150mm)
- Door: Sliding; Rolled Up Door (Manual/Auto)
- Window: Aluminum Alloy; PVC
- Downspout: PVC pipe
- Gutter: Galvanized Steel Sheet; Stainless Steel
- Ventilator: Stainless Steel Turbine Ventilator
- Skylight Belt: FRP or PC semi-transparent Skylight Belt
- Flash: Color Steel Sheet
- Fittings: Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc
- Wide span capability: Single span or multi-span configurations available
- Cost-effective: Pricing from $50/m² to $80/m² based on specifications
- Long service life: 20-50 years depending on environmental conditions
- Rapid construction: Easy installation process reduces build time
- Environmental benefits: Energy efficient and recyclable materials
- Structural stability: Excellent earthquake resistance and waterproofing
- Detailed shop drawings provided prior to installation
- On-site training available at our factory
- Option for sample structure assembly demonstration
All structural components, panels, bolts, and accessories are securely packed for ocean transportation and loaded into 40'HQ containers. Our skilled workers use cranes and forklifts to ensure damage-free loading.
FAQ
1. What are the main differences between a steel structure office building and a steel workshop?
Steel office buildings focus on office comfort, sound insulation, daylighting, facade aesthetics and public building fire compliance. It adopts light long-span steel frame with higher requirements for interior finishing, noise control and thermal insulation. Steel workshops are designed for heavy equipment load, crane load and mechanical vibration resistance, with heavier main steel frames and priority given to industrial operation.
2. Can the facade adopt glass curtain wall?
Sure. Glass curtain wall, aluminum veneer, stone-like coating and integrated thermal insulation wall panels are all optional facade solutions. We can customize the exterior style according to your aesthetic requirements.
3. What are the main steel materials used?
Main frame: Q355B H-section steel. Secondary components: Q235B steel. Surface treatment: sand blasting + multi-layer anti-corrosion and fire-proof paint or hot-dip galvanizing as options.
4. How many floors can the steel structure office building be built?
Conventional design: 2–6 floors. Higher floors can be customized after professional structural calculation according to local wind load, seismic standard and land conditions.
Customized design is welcomed. To receive an accurate quotation and drawings, please provide the length, width, eave height and local weather conditions.
| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4 | snow load (max. snow height) | _____kn/m2, _____mm |
| 5 | anti-earthquake | _____level |
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
RWe are a textile factory and require large-span production workshops and warehouses. Yidongxiang's column-less design provides us with the maximum space for equipment layout. Their H-shaped steel has a thickness 2mm higher than the industry standard, and the anti-corrosion coating has also been thickened. So far, after half a year of operation, there have been no problems at all.
-
MAs a third-party warehouse service provider for Amazon, we need large-span warehouses that can be quickly established. Yidongxiang's steel structure warehouse fully complies with American building standards. All components have a prefabrication accuracy of less than 2mm, and the main structure of the 12,000 square meters warehouse was installed on-site within 30 days. Currently, our storage capacity has increased by 60% compared to before, and the efficiency of goods turnover has also improved significantly. I highly recommend it!
-
JYidongxiang's construction speed is truly remarkable. Our 10,000-square-meter warehouse was completed and delivered within just 45 days after the contract was signed. Moreover, their overall service is very professional. From design to installation, there are dedicated personnel handling each step. We hardly had to worry about any details.