Large Span Prefabricated Metal Storage Buildings Steel Structure Storage Warehouse
Large Span Prefabricated Metal Storage Buildings
,Prefabricated Metal Storage Buildings
,Large Span Steel Structure Storage Warehouse
| Design Dimension | Key Points | Technical Details |
|---|---|---|
| Structural Safety | Seismic/wind resistance, dynamic load optimization, fire and corrosion protection | BRB dampers, wind tunnel testing; fireproof coating (≥2h) + hot-dip galvanizing. |
| Material Selection | High-strength steel, lightweight envelope, eco-friendly materials | Q355B steel (yield strength≥355MPa); polyurethane panels (fire rating B1); recycled steel usage≥30%. |
| Prefab Component Design | Large-span modular design, standardized joints, transportation segmentation | 40m-span trusses; bolted-welded hybrid joints; segments≤15m (transport height≤4.5m). |
| Energy Efficiency | Natural ventilation/lighting, PV systems, rainwater recycling | Skylights (≥20% coverage); PV efficiency≥22%; underground rainwater storage≥150m³. |
| Construction Quality | High-precision prefabrication, on-site assembly management, digital acceptance | BIM modeling (±3mm); UT for welds (coverage≥40%); 100% bolt torque inspection. |
- Seismic & Wind Resistance: Buckling-Restrained Braces (BRBs) and flexible frames dissipate seismic energy; wind tunnel tests validate load distribution.
- Dynamic Load Design: Simulate crane loads (e.g., 50t overhead cranes) and stacking loads per GB 50009-2012, ensuring joint fatigue life≥50 years.
- Fire & Corrosion Protection: Apply intumescent coatings (fire resistance≥2h) and hot-dip galvanizing + epoxy coatings for harsh environments.
- Main Steel: Q355B steel (tensile strength 470-630MPa) for primary structures; cold-formed steel (1.5-3mm thickness) for lightweight needs.
- Envelope System: Polyurethane panels (thermal conductivity≤0.024W/m*K) with rock wool insulation (density≥100kg/m³).
- Eco-Materials: Recycled steel (recovery rate≥30%) and solvent-free epoxy flooring (VOC≤50g/L) reduce carbon footprint.
- Large-Span Modularization: 40m-span trusses or space frames maximize storage space (clear height≥10m).
- Standardized Joints: Predefined joint catalogs (e.g., rigid beam-column connections) cut welding time by 25%.
- Transportation & Assembly: Segments≤15m with temporary bracing; on-site assembly error≤3mm.
- Passive Design: Skylights (≥20% coverage) and smart louvers reduce HVAC energy use by 40%.
- Renewable Energy: Monocrystalline PV panels (≥300kW*h/day) and ground-source heat pumps cover 30%+ energy demand.
- Resource Recycling: Bolted connections and precast foundations enable 95%+ material recovery at end-of-life.
- Factory Prefabrication: Laser cutting (±1mm) and robotic welding ensure component consistency.
- On-Site Management: BIM + 3D scanning monitors installation; column verticality≤H/1000, beam ≤L/1500.
- Acceptance Standards: Per GB 50205-2020: Welds: UT≥40%, MT full coverage; Bolts: 100% torque inspection, preload error≤±10%.
- Building Dimension: Length*width*height, eave height, roof type etc.
- Doors and windows: Dimension, quantity, position to put them if you have your own requirements.
- Local climate: Wind speed, snow load, earthquake etc.
- Insulation material for roof and wall: Sandwich panel or single metal sheet.
- Crane if have: Do you need crane beam inside the steel structure? And its capacity.
- If have other requirements, such as fire proofing, isolated roof, roof ventilation and daylighting etc, please kindly inform us.
- Every one week meeting for Quality Audit to solve the weakness during processing and procedures
- Every two weeks meeting for employee training.
- Producing as to the International Steel Structure Standard with ISO 9001 Quality Control System
- Each project, every 1 months, connect with clients for feedback and complaints, then improve the quality control actions.
- Quality inspection report for every process during production. Ensure 100% good quality products.
| Item | Description | Your Input |
|---|---|---|
| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4 | snow load (max. snow height) | _____kn/m2, _____mm |
| 5 | anti-earthquake | _____level |
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
-
MWhen building a warehouse in an earthquake-prone area, safety is of the utmost importance to us. The steel structure warehouse of Yidongxiang has been designed with an earthquake resistance level of 9. All the joints have been reinforced. During an earthquake, the warehouse remained intact and the goods we stored were not damaged. We are truly at ease.
-
RAs a cold chain logistics company, we have very strict requirements for the insulation and sealing of our warehouses. The team at Yidongxiang worked closely with our insulation supplier to solve the connection problem between the steel structure and the insulation layer perfectly. Now the insulation effect of the warehouse is even better than expected, and the operating costs have been reduced by 15%.
-
FWe are a grain processing company and we need large storage warehouses for storing a large quantity of grains. Yidongxiang's steel structure warehouse has a net height of 10 meters. The shelves can be built up to 8 meters high, and the storage capacity has increased by 50% compared to the previous warehouse. Moreover, their pest and rodent prevention design is also very thorough, resulting in a significant reduction in grain loss.