Customizable Steel Frame Warehouse 120m Span Corrosion Resistant
Fast Build Modern steel frame warehouse
,Fast Build Steel Frame Warehouse
,Modern Design Steel Frame Warehouse
| Product Insulation | Thermal Insulation |
| Product Resistance | Corrosion Resistant |
| Product Design | Customizable |
| Aesthetics | Modern |
| Fire Resistance | High |
| Flexibility | High |
| Construction | Steel Frame |
| Structural Integrity | Excellent |
| Structure Type | Frame |
| Frame Type | Steel Frame |
| Earthquake Resistance | Strong |
| Windows | Aluminum |
| Seismic Design | High Seismic Zone |
| Installation Time | Short |
| Construction Type | Frame |
| Cost | Moderate |
| Finish | Galvanized/Painted/Cladding |
| Roof | Glass Wool, EPS, PU |
| Product Fire Resistance | Fireproof |
| Door | Sliding Door or Rolling Door |
- Span Capacity: Clear spans up to 120m using space frame systems
- Construction Speed: 40% faster than concrete structures
- Seismic Performance: Energy dissipation capacity of 25-35% through ductile connections
- Life Cycle Cost: 30-50% lower maintenance cost over 50-year lifespan
| Property | Structural Steel | Reinforced Concrete | Prefab Aluminum |
|---|---|---|---|
| Density (kg/m³) | 7,850 | 2,400 | 2,700 |
| Tensile Strength (MPa) | 400-550 | 3-5 | 90-250 |
| Thermal Conductivity | 50 W/m*K | 1.7 W/m*K | 237 W/m*K |
| Recyclability | 98% | 30% | 95% |
- Live loads: 0.75-1.5 kN/m² (industrial use)
- Wind loads: 0.6-2.1 kN/m² (zone-specific)
- Crane loads: Up to 1000t capacity in heavy industries
- Moment-resistant joints: Extended end-plate (EEP) connections
- Slip-critical bolting: ASTM F3125 Grade A325 bolts
- Semi-rigid connections: 15-25% rotational stiffness
| Stage | Duration | Key Equipment | Tolerance Control |
|---|---|---|---|
| Cutting | 15-30 hrs | CNC Plasma (40,000A) | ±0.5mm |
| Forming | 20-40 hrs | Hydraulic Press (5000t) | ±1.2mm |
| Welding | 50-80 hrs | SAW (1000A) + Robotic MIG | AWS D1.1 Class A |
| Surface Tx | 10-15 hrs | Grit Blasting (SA 2.5) | 60-80μm profile |
- Digital Twin Integration: Real-time stress monitoring with IoT sensors (5G enabled)
- Automated Erection: AI-guided cranes achieving 0.5cm positioning accuracy
- Sustainable Solutions: Photovoltaic steel roofs (BIPV) with 25% energy generation
Three-coat systems per ISO 12944-C5:
- Zinc-rich primer (75μm)
- Epoxy intermediate (150μm)
- Polyurethane topcoat (50μm)
Corrosion rate: <1.5μm/year in marine environments
| Column and beam | Material Q355 box or H-shaped steel (painted or galvanized) |
| Steel structure spraying | Galvanized or painted |
| Wall & roof purlin | C or Z section steel |
| Wall & roof panel | Colorful corrugated steel sheet, sandwich panels with EPS, rock wool, fiber glass, PU etc. |
| Support | Steel angle, steel pipe, steel round |
| Gutter | Steel sheet or galvanized steel sheet |
| Downpipe | PVC pipe |
| Door | Sliding sandwich panel door or rolling metal door |
| Window | PVC or aluminum alloy windows |
| Accessory | Anchor bolt, high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc |
Our steel structure buildings have many applications including workshops, warehouses, office buildings, multi-story buildings, hangars, garages, livestock farms, poultry farms, etc.
- Low cost, convenient
- Easy assembly and disassembly many times without damage
- Widely used in construction sites, office buildings, etc.
- Good environmental protection
Causes:
- Exposure to moisture, chemicals, or salt-laden air in coastal/industrial areas
- Insufficient protective coatings (e.g., <3 layers of paint)
- Poor drainage systems leading to water pooling
Solutions:
- Apply 3-coat systems per ISO 12944-C5 standards (zinc-rich primer + epoxy + polyurethane)
- Use hot-dip galvanizing (85μm minimum thickness) for critical components
- Install sloped roofs (≥5° pitch) and gutter systems to prevent water retention
Common Problems:
- Porosity, cracks, or incomplete penetration in welds
- Fatigue failure at high-stress connections (e.g., crane rails)
- Thermal distortion from uneven heating during welding
Preventive Measures:
- Follow AWS D1.1 standards for weld quality and NDT (X-ray/ultrasonic testing)
- Use preheating (150-260°C) for thick sections to reduce residual stresses
- Design moment-resisting connections with 20-30% overcapacity
Issues:
- Misalignment of roof/wall panels due to temperature fluctuations (ΔT ≥40°C)
- Buckling of long-span beams (>30m)
Mitigation:
- Install slotted bolt holes to allow 10-15mm movement
- Use expansion joints every 60-90m in building length
- Select materials with low thermal conductivity (e.g., insulated panels with λ ≤0.05 W/m*K)
Risk Factors:
- Inadequate soil compaction (bearing capacity <150 kN/m²)
- Differential settlement from uneven loads (e.g., heavy machinery)
Remedies:
- Conduct geotechnical surveys to determine soil type (e.g., clay, sand)
- Design pile foundations (15-30m depth) for soft soils
- Install grout-filled leveling plates under column bases
Sources:
- Machinery operation (e.g., CNC machines: 70-90 dB)
- Resonance in lightweight roof decks
Control Methods:
- Use vibration isolators (natural frequency ≤5 Hz) under equipment
- Install acoustic panels (NRC ≥0.75) on ceilings/walls
- Add mass to roof systems (e.g., 100mm concrete topping)
| Issue Category | Typical Defects | Recommended Solutions | Standards Referenced |
|---|---|---|---|
| Corrosion | Rust, pitting, coating flaking | 3-coat painting, galvanizing, drainage design | ISO 12944, ASTM A123 |
| Welding | Cracks, porosity, distortion | Preheating, NDT, overcapacity design | AWS D1.1, EN 1090-2 |
| Thermal Movement | Panel gaps, beam deflection | Slotted bolts, expansion joints | ASCE 7, AISC 360 |
| Foundation | Cracks, uneven settling | Pile foundations, soil stabilization | IBC 2021, ACI 318 |
| Noise/Vibration | Worker discomfort, equipment wear | Isolators, acoustic dampening | OSHA 1910.95, ISO 3746 |
- Bi-annual inspections: Check coatings, bolts, and drainage (post-monsoon/winter)
- Real-time monitoring: Install IoT sensors to track strain (±0.01% accuracy) and humidity
- Training programs: Certify welders to ISO 9606-1 and crane operators to OSHA 1926.1400
Are you a manufacturer or trading company?
We are a manufacturer and welcome visits to our facility to observe our quality control processes and production capabilities.
We offer the best price for equivalent quality and the best quality for equivalent prices, working to reduce your costs while ensuring product excellence.
We provide detailed installation drawings and can send engineers or a complete installation team upon request.
We welcome inspectors at any stage of production, including container loading.
Yes, we provide complete design solutions using AutoCAD, PKPM, Tekla Structures and other professional software.
_____country, area
_____mm*_____mm*_____mm
_____kn/m2, _____km/h, _____m/s
_____kn/m2, _____mm
_____level
If yes, 1.2m high or 1.5m high
If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former
_____units, _____(width)mm*_____(height)mm
_____units, _____(width)mm*_____(height)mm
If yes, _____units, max. lifting weight____tons; max. lifting height _____m
-
RWe are a textile factory and require large-span production workshops and warehouses. Yidongxiang's column-less design provides us with the maximum space for equipment layout. Their H-shaped steel has a thickness 2mm higher than the industry standard, and the anti-corrosion coating has also been thickened. So far, after half a year of operation, there have been no problems at all.
-
MWhen building a warehouse in an earthquake-prone area, safety is of the utmost importance to us. The steel structure warehouse of Yidongxiang has been designed with an earthquake resistance level of 9. All the joints have been reinforced. During an earthquake, the warehouse remained intact and the goods we stored were not damaged. We are truly at ease.
-
SAs a third-party logistics company, we require modular warehouses that can be quickly deployed. Yidongxiang's products fully meet our needs. Their prefabricated components are well-packed and were undamaged upon arrival. Local workers assembled them in just a few hours according to the installation manual, which was very convenient.